Bathroom Installation in London
A bathroom that lasts twenty years comes from getting the plumbing right at the start — proper soldered joints, correctly sized waste runs, isolation valves on every appliance, and a bath that doesn’t flex when you stand in it. Ilir has been installing bathrooms across London since 2004. He handles all the plumbing himself; for tiling, electrics and plastering he works with trusted trades he’s used for years, so the whole job stays under one roof and you don’t have to project-manage four different people. He’ll source the suite if you want, or fit one you’ve bought yourself.

What's in every job
- Strip-out of existing bathroom (including disposal)
- New supply pipework and waste pipework where needed
- Bath, shower, toilet, basin, taps, valves and trim
- Walk-in showers with proper fall and waterproofing
- Towel rail / heated radiator install
- Coordination with tiler, electrician and plasterer where needed
- Test, commission, sign off
Typical job duration: 4–14 days
How the job gets done
No rush, no surprises. Here is the process from first call to handover.
Survey and design
Ilir measures the room, looks at the existing pipework, and helps you sense-check your design.
Quote
You get a clear breakdown of labour, parts, timeline and the trades involved.
Strip out
Old bathroom removed, surfaces prepped for new install, dust contained.
Install
New pipework, waste runs, fixtures and fittings — to the correct standard, not a rushed job.
Snag and finish
Everything tested for leaks, sealants finished neatly, room handed back clean.
Questions Ilir gets asked all the time
Send Ilir the details
A few sentences about what's going on. Free no-obligation quote within a few hours on weekdays.
Other services Ilir provides
Leak Repair
Hidden leaks found and fixed. Concealed pipework traced without ripping up half your house.
Read more →Tap Replacement
New kitchen and bathroom taps fitted properly with isolation valves. Old tap removed, new tap tested.
Read more →Toilet Repair & Replacement
Running toilets, leaking toilets, blocked toilets, full toilet replacements. All fixed properly.
Read more →Central Heating
New radiators, system upgrades, smart thermostats and full central heating installs. Designed properly the first time.
Read more →