Bathroom Installation in Ealing
W3 · W5 · W7 · W13 · UB1 · UB6
Bathroom Installation in Ealing typically means working with mostly inter-war and Victorian semis, family houses in Ealing Broadway and Acton, and post-war housing further west. After 22 years across W3, W5, W7, W13, UB1, UB6, Ilir knows the local quirks. Whether you're in Ealing, Acton or anywhere else in the borough, the same one-man approach applies — Ilir surveys, quotes, fits and stands behind every job himself.

Every bathroom installation in Ealing
- Strip-out of existing bathroom (including disposal)
- New supply pipework and waste pipework where needed
- Bath, shower, toilet, basin, taps, valves and trim
- Walk-in showers with proper fall and waterproofing
- Towel rail / heated radiator install
- Coordination with tiler, electrician and plasterer where needed
- Test, commission, sign off
Typical job duration: 4–14 days
What Ealing properties throw at a plumber
The challenges Ilir sees most often when doing bathroom installation across Ealing.
- 01Boilers replaced for the first time in 25 years
- 02System boilers being converted to combi
- 03Sludge in older heating systems before boiler replacement
Read more about plumbing in Ealing or browse all bathroom installation details.
Bathroom Installation in Ealing — questions Ilir hears
Need bathroom installation in Ealing?
A few sentences about what's going on. Free no-obligation quote within a few hours on weekdays.